Today

20251020_1721252222.jpg
 
I had to manually check the elevation drawings I previously downloaded of Sky Tower, which indicate what @interchange42 said in mid-September:

@Contra's diagram indicates they are pouring the 95th floor right now.
To be honest, I wouldn't trust me anymore 😅
 
^Thread for this is over here:


Northern Light-san has all the dirt and details. Enjoy! <3
 
Why does it feel like skytower will top out before 1 bloor west?
Depending on your definition, one bloor west is technically topped out. But that’s really only the columns so it feels disingenuous to say that…

But I have a strange feeling that this’ll top out before 1bw’s crown is completed.
 
Level 95
Some ground floor civil work on Lake Shore.
The specialize balcony work is time consuming.
The glazing delivery/installation has paused at level 79 at which point the taper starts. Probably more custom product.

IMG_3523.jpeg


IMG_3526.jpeg


Balcony to curtain wall transition
IMG_9194.jpeg


XX marks the spot
IMG_9193.jpeg


You don’t see that too often. Lifted it or drove in? 😀
IMG_9192.jpeg


IMG_9191.jpeg


Looking very nice. Hotel room if I recall correctly. Maybe too nice for a hotel room. EDIT: Hotel level ends at 12. This is residential which makes more sense.
IMG_9190.jpeg


Light connections poking through? The level below this doesn’t have this support device or conduit.
IMG_9195.jpeg
 
Last edited:
It looks taller than FCP despite being at a lower elevation...
 

Back
Top