View from Front/Bathurst on Aug. 4:
IMG_0052.jpeg

IMG_0053.jpeg
 
It looks like the production is back to full speed after a 3 week pause to change out the RCS, move all the equipment and concrete pump to the north side, and let One Bloor West catch up.

I think the tower started to get a little skinner at the taller 3.28m level 78 too.
IMG_2162.jpeg


Pouring the floor of level 84. (EDIT Maybe 84 walls or 85 floor?) One Bloor West is working on the corners of level 84 too.
IMG_2161.jpeg
We

IMG_2160.jpeg


IMG_2158.jpeg



Aug 14 - new RCS complete
IMG_2072.jpeg



Aug 14
IMG_2052.jpeg



Aug 11
IMG_8772.jpeg



July 28
IMG_1678.jpeg


So close today.
IMG_8773.jpeg
 
Last edited:
I thought it was at level 85 a few weeks ago? Should be at 87 or 88 by now...
It looks like the production is back to full speed after a 3 week pause
I think the new RCS is modified specially for the tapered shape of the remaining floors, should continue to move at pace.
 