Moon passed over the crane, with Pinnacle’s logo.

Bibi L - don’t use without permission or credit - IMG_9256.jpg
 
Last edited:
"Anson Kwok, vice-president of sales and marketing with Pinnacle, said the building is now at 33 storeys and it’s rising at a rate of one floor every five days."

"The third phase of the north parcel will be a 92-storey tower. Kwok said no timetable has been announced for its launch."

 
"Anson Kwok, vice-president of sales and marketing with Pinnacle, said the building is now at 33 storeys and it’s rising at a rate of one floor every five days."

"The third phase of the north parcel will be a 92-storey tower. Kwok said no timetable has been announced for its launch."


The top 10 floors of phase 1

“Kwok acknowledged the first building, the Prestige, is still being marketed two years after completion but said the full-page ads are mainly to sell the larger top floors. The SkyTower, he said, is “definitely, sales-wise, in a strong position.””
 
The top 10 floors of phase 1

“Kwok acknowledged the first building, the Prestige, is still being marketed two years after completion but said the full-page ads are mainly to sell the larger top floors. The SkyTower, he said, is “definitely, sales-wise, in a strong position.””
Those last 10 floors really look vacant at night when no light emits from them.

Bibi L - don’t use without permission or credit - IMG_9784.jpg
 
In the hindsight, should have released these units a lot sooner? A project's lifecycle is long and anything can happen in that period.
 
Progress from today and other days.
Today. They installed the white cladding next to the tower glass. Glass is still at floor 16.
The “SKY” part was raised to floor 34 today.

Bibi L - don’t use without permission or credit - IMG_9822.jpg


Bibi L - don’t use without permission or credit - IMG_9823.jpg


Concrete pour.

Bibi L - don’t use without permission or credit - IMG_9824.jpg


Whole tower today.

Bibi L - don’t use without permission or credit - IMG_9833.jpg


Bibi L - don’t use without permission or credit - IMG_9834.jpg


Progress from Monday.
They re-installed the two glass panels they removed from Friday.

Bibi L - don’t use without permission or credit - IMG_9827.jpg


The white cladding had only reached floor 14 on Monday.

Bibi L - don’t use without permission or credit - IMG_9825.jpg


Bibi L - don’t use without permission or credit - IMG_9826.jpg
 