Sky High Arch
New Member
The existing phase 1 is 6 floors along with a lower P6 area. The lower P6 was on the east mid side of phase 1. Phase 2 only has 6 parking levels and does not have the lower P6Yes, they still need to excavate P6. To clarify I meant one more level plus some as it's not very definitive how deep they've gone in relation to the existing structure. Certainly portions of P5 are exposed.