Yeah it seems that way on the south side of the podium. Can anyone tell me if those four top floors are supposed to be reserved for the hotel or office space etc?
There is no office space in the development north of Harbour Street. The hotel will be in the podium of the 95-storey tower. The second storey of this building is mostly community centre. The podium suites are affordable housing units.

42
 
It looks like the shoring rig is being dismantled. :(

20200526_090003.jpg
 
Why do you think it looks like it's being dismantled? Perhaps they are just changing the gauge of the driver? (I'm not sure about terminology, but with the permits just actioned, why would they be dismantling?)
 
Why do you think it looks like it's being dismantled? Perhaps they are just changing the gauge of the driver? (I'm not sure about terminology, but with the permits just actioned, why would they be dismantling?)
Potentially because they might be delaying construction on the other phases due to the sales slowdown. I wouldn't be surprised if this was the case.
 
Potentially because they might be delaying construction on the other phases due to the sales slowdown. I wouldn't be surprised if this was the case.
Thats what it looks like, Pinnacle did the same thing across the street when the 2008 crash happened, they were on the podium on the west tower when they halted construction until things improved.
 
Sunday
AE30F44A-9B96-4613-BBFC-398C96E6F813.jpeg


level 7 roof
0F4B03B6-9FB4-4864-8FCD-AB9154194FC7.jpeg

from City of Toronto site plan approval.

3731ADFD-0F2F-4A84-B8EE-279346B45997.png


level 4 roof
DB1EC48A-EF31-4E9E-96CB-6381609B7816.jpeg


FD95BE77-33BD-488D-A1E9-E9BE9FC8E49E.jpeg



Level 6 almost complete
8CCAD43A-44B2-433C-B6F9-392FED33AAAF.jpeg


70D10588-C37E-448B-9D5D-4CD01DEB9DEB.jpeg


Future overview
747B9D8D-A0A2-4505-9830-298D1FF2A972.jpeg


A few (>10?) thousand people will be calling this area home (or just visiting for the weekend) in the next few years. Unless everyone “decides” to work from home in the burbs.
E1AB0D11-7A5E-4D1C-A9D8-4D8B30F0768E.jpeg
 
1 YONGE ST
Ward 28 - Tor & E.York District


Proposal to revise the approved OPA and ZBA as it relates to the southerly parcel (phase 4 and 5) to allow for the inclusion of a hotel use within Phase 4 of the redevelopment, as well as changes to the proposal including the addition of a pedestrian bridge between Towers 4 and 5.

 