The way the southern part seems to have a pretty clean and isolated dig site makes me wonder how quickly we’ll see developer plans for the rest of the land. Might have to pull up the original plan for 5 towers before the land swap to compare when we do.

In the end, did the city actually *get* anything out of that whole land swap?
There was no swap here, the Province expropriated the First Parliament Site.
 
There was no swap here, the Province expropriated the First Parliament Site.

IMG_1450.jpeg
 
View attachment 620605
There were several land transactions. As you quote above, the first was the City and the Bresler (sp??) family swapped land. The family owned most of the "First Parliament site" on west side of Parliament Street (the City and the Toronto Heritage Trust owned some parts too.). The City owned the block on the east side of Parliament occupied by the Library Processing centre). There was a swap/expropriation so the family got the whole block on east side of Parliament and the City owned most of the First Parliament Site and made elaborate plans for it. (The Heritage Trust owned the small area at NW corner of the site.) SEE: https://www.toronto.ca/services-pay...ing-city-facilities/first-parliament-project/

Then, just when the City were getting set to move, the Province expropriated the City land AND the (supposedly protected) OHT section.

EDIT: Prior to all of the above, the City and TTC with the OHT swapped the former TTC streetcar turning loop on SW corner of Parliament and King for a large part of the First Parliament (Parliament/Front/Berkeley/Parliament Park) block and the car dealership moved from the NW corner of the First Parliament block to the former TTC loop (just east of Staples). The OHT created an exhibition space in the refurbished former car dealership. The car dealer (and Staples) were also expropriated for the Ontario Line.
 
Last edited:
Was looking at the site today and wondering whether they could have excavated the whole block, with the intention to build on the rest. Anyone know if this precludes or makes it tougher to build depth on the east side in coming years?

On second glance it looks like it would reduce staging areas, not to mention add significant cost on Metrolinx. But I hope we see movement for the rest of the lot sooner than later instead of waiting for 10-15yrs for the subway to finish.
 
Was looking at the site today and wondering whether they could have excavated the whole block, with the intention to build on the rest. Anyone know if this precludes or makes it tougher to build depth on the east side in coming years?

On second glance it looks like it would reduce staging areas, not to mention add significant cost on Metrolinx. But I hope we see movement for the rest of the lot sooner than later instead of waiting for 10-15yrs for the subway to finish.
I think the housing market will have a bigger impact than subway construction on when the TOC development gets built. I would think this development is well into the future given current market conditions.
 
Are those piles shown under the station platform? I have notices these on other station drawings. Wondering why they would be needed as they will be well into bedrock with good bearing capacity at that depth.
Not all bedrock is equal. Around here it’s mostly shale, which is weaker and more prone to weathering/fracturing than something like a granite bedrock. Not sure how much it factors in but these stations are also being built to support towers overtop.
 