It feels like we've been stuck at this stage for a long time. Feel like very little progress has been made in months. I guess it's because it's a mechanical floor?
Most of the progress that has been going over the last few weeks has been in the interior core of the building once the RCS was removed they still had four floors of elevator shaft and lobby ways to pour to get to the cap which I assume is probably being formed right now from there I imagine we will start to see steel work go up for the mechanical level and TMD and eventually we will see the crown start to take shape I think this will happen around the end of the month though I have no idea just speculation
 
Photos taken today, Friday (Sept. 5). Since I posted a week ago, the only visible movement at the very top of the tower is now that both elevators have been installed to the 84th floor. Will it go up to 85 once they have something there? We shall see. But all the corners are presumably complete so maybe we'll soon see some work on the crown - maybe time for some drone shots to see what's going on with the corners and the core at top? In terms of the installation of the skin, the west Rail Climbing System (RCS) has joined the east and north RCSs at level 67, up one level from last week, and the south mini-RCS is also up a level to 66. And the first visible set of level 67 skin has now been installed, on the south face.

The usual pile of photos, starting with the view from the south at Yonge and Dundas, moving to around Yonge and Charles, with a Pizza Nova truck nicely framing the shot, and some tighter shots showing the south face around the RCSs, and the view from the alley off Balmuto looking straight up the external elevator and crane. Then, a look from below off Balmuto, from Bloor by the Holt Renfrew, and then from Cumberland east of Bay including a tighter shot showing the north and west RCSs even at level 67. Then, the view from the corner of Yonge and Bloor, from across the street on Yonge, then from Church and Wellesley to the SE, from College and Queen's Park to the SW, from Harbord near St George, then from Bloor east of Spadina, finally from Bloor and Perth in the west end.



UTIMG_7199.jpg
UTIMG_6876.jpg
UTIMG_7016.jpg
UTIMG_7038.jpg
UTIMG_6609.jpg
UTIMG_6646.jpg
UTIMG_6681.jpg
UTIMG_6729.jpg
UTIMG_6838.jpg
UTIMG_6858.jpg
UTIMG_7131.jpg
UTIMG_6597.jpg
UTIMG_6565.jpg
UTIMG_6522.jpg
UTIMG_6487.jpg
 

Back
Top