Interesting to watch them working today (Sunday) installing the panels at the 2nd mechanical room. They are using the big crane to lift a smaller crane to lift the panels and position them in place. While all of this was happening, I saw a hawk flying around but couldn't capture it in my shots.

20250223_094529.jpg
20250223_094535.jpg
20250223_094548.jpg
20250223_094552.jpg
20250223_105949.jpg
 
Pics from a very grey yesterday, some of the images are so greyed out you'd think I pulled a @Lenser but nope....that's just what the real world looked like.... on February 25th, 2025:

DSC05038.JPG


DSC05039.JPG


DSC05043.JPG


DSC05042.JPG


DSC05040.JPG


Now for a series of 3 that the rise Pemberton will make impossible at some point in the future.....

DSC05053.JPG


DSC05054.JPG


Now really up close, up top:

DSC05055.JPG


Finally, from Yonge, south of Maitland:

DSC05098.JPG


DSC05099.JPG
 
Last edited:
Interesting to watch them working today (Sunday) installing the panels at the 2nd mechanical room. They are using the big crane to lift a smaller crane to lift the panels and position them in place. While all of this was happening, I saw a hawk flying around but couldn't capture it in my shots.
They actually tried to do it on Saturday but it was too windy, and the small crane/panel was spinning uncontrollably after they brought it all the way up. They eventually aborted mission and came back on Sunday!
 