The pics by @jer1961 above seem to show the final glass cladding on the mechanical floors. It is similar to the section connecting the tower to the western elevator core:

IMG_4681.jpeg
 
I noticed khaldoon-san said "final glass cladding"...does not include the eventual metal louver cladding thingies that will be added there after. I hope.
 
So basically if you want to keep track of where they are underneath the hanging frame just look at where they are at the back where the crane is located is what I'm seeing
 

Back
Top