So I presume there’s still the “upper section” of the top of the tower to go?
If the floor account is correct on the elevator shaft, it said 76 that line up with the 5th lower floor. Beyond that, not sure what the top looks like.
 
If the floor account is correct on the elevator shaft, it said 76 that line up with the 5th lower floor. Beyond that, not sure what the top looks like.
IMG_3389.jpeg

I was referring to that when I said the top 😁

I wonder what it’s called, and based off the slope of where it’s at right now, I don’t believe it’s there yet, correct me if I’m wrong tho
 
View attachment 676751
I was referring to that when I said the top 😁

I wonder what it’s called, and based off the slope of where it’s at right now, I don’t believe it’s there yet, correct me if I’m wrong tho
Need to shoot it from the north or the south side as this is an east shot to see where it is at this time,
 
View attachment 676751
I was referring to that when I said the top 😁

I wonder what it’s called, and based off the slope of where it’s at right now, I don’t believe it’s there yet, correct me if I’m wrong tho
Aug 29
According to today shots, they are working on the 79th floor with the hording gone from the east and south side. Hording still in place where I could got the best shot if it wasn't for the hording. The westside has a small section of hording in the middle with an indent in the 78th floor from what I could see.

Still have to work on Aug 19 and 29 shots that should be all online next week

A couple of today shots
133A2735.JPG
133A2705.JPG
133A2606.JPG
 