Transportfan
Senior Member
I only call it the Hurontario LRT line period, and my photos are tag that way also
By "you're", I was referring to Metrolinx. I know you yourself didn't number the line.
I only call it the Hurontario LRT line period, and my photos are tag that way also
One problem I foresee with splitting into two lines arises from how the MCC loops for both lines will respectively travel in only one direction. Assuming the 2014 service pattern, with the northern line running one-way clockwise around MCC, trips coming from Brampton to the Square One GO terminal will have to eitherI imagine there will be two service patterns:
I see that the envisaged service pattern excludes #1 above, which is probably a mistake. 3 seems like the one we could dispense with if needed.
- Linear down Hurontario from Brampton Go to Port Credit Go via Mississauga CC transit terminal
- MCC loop to PC GO
- Perhaps if demand warrants it, a Brampton Go to MCC loop, which could utilize the opposite direction of the loop as 2
Ngl, that would be so funny...Line 10. Ugh!Why not rename the Yonge-University subway Line 11-11A while you're at it?
I doubt Hamilton will be 8. I'd guess that if anything, it would be 11 or 20. I'd go with H1, A, or B myself.Hamilton will probably be Line 8. The big question now is where 7 and 9 will fit in.
That must be a rendering. With the pans up is saying the OS is in place and only in the building as there isn't any up in the yard or anywhere for the line.Can't recall if interior shots of the MSF have been posted. This article has one.
![]()
Rail News - Ontario to extend Hazel McCallion LRT line, build Mississauga loop. For Railroad Career Professionals
www.progressiverailroading.com
View attachment 540163
Not an ML Line, but it could be Line 8/24. Or could be 824If Hamilton got numbered, would it make sense to do the same with ION in the Waterloo Region? Hard call.
seanmarshall.ca