More up on site
Should had stay home or gone into Toronto or gone up to the north end than have to wait over 90 minutes for a bus to PC when they are supposed to be every 14 minute. Only 2 of all the buses on the route were 60's and real dumb having 40's when all the buses were crush loads to the point "Sorry Full" as they drove by stops. Had to wait an hour leaving PC. Could have done then north end, since they were on schedule.
First haft of the PC station at concourse level and starting to work on the wall for the roof. the base for the push box and the barrier wall to support the pushing of the box has been removed with some grading for the rest of the station up to the push box.
The new Englewood Bridge is paved as well both sides of it, but missing the railing. One hope they are not planning on open this bridge anytime soon as no traffic lights foundation in place as well having the guideway in place to take the tracks from the centre to the side.
They have shifted the lanes to do waterline work on the east side.
33 new parking spots open next to the Mary Fix retraining wall to the end of the GO parking lot
More up on site
Should had stay home or gone into Toronto or gone up to the north end than have to wait over 90 minutes for a bus to PC when they are supposed to be every 14 minute. Only 2 of all the buses on the route were 60's and real dumb having 40's when all the buses were crush loads to the point "Sorry Full" as they drove by stops. Had to wait an hour leaving PC. Could have done then north end, since they were on schedule.
First haft of the PC station at concourse level and starting to work on the wall for the roof. the base for the push box and the barrier wall to support the pushing of the box has been removed with some grading for the rest of the station up to the push box.
The new Englewood Bridge is paved as well both sides of it, but missing the railing. One hope they are not planning on open this bridge anytime soon as no traffic lights foundation in place as well having the guideway in place to take the tracks from the centre to the side.
They have shifted the lanes to do waterline work on the east side.
33 new parking spots open next to the Mary Fix retraining wall to the end of the GO parking lot