Remember the timeline?
http://www.slideshare.net/Crosstown...opportunities-information-session-november-24
Slide 15
Mount Dennis is a simple station, I don't know why you guys think it's difficult. It's almost at ground level so it will take a shorter time to construct. Mt Dennis and Science Centre which are along an alignment that is constructed by cut and cover would take significantly less time than the deep TBM stations. Cedarvale, Eglinton and Kennedy are the difficult ones. They'll take about 4.5 years.
The other stations would take 3 years or so. They won't start all the construction at one time cause that will screw up traffic for the entire corridor and they'll lack equipment to built everything at the same time. They'll do an assembly line process, start at Keelesdale and move east. Plus they will use Keelesdale Station as a pilot station so it'll go a little slower than the rest of them.
The elevated bridge across Black Creek would be done in 2018 and would stand empty for three years! The surface stops would be done in late 2019. We'll be staring at this LRT for a long time without trains.