There is plenty green space on the southwest corner of Martin Grove and Eglinton for the LRT to go under the intersection to a stop at that corner. It would reduce traffic congestion, which currently happens with the 32 Eglinton West buses.
View attachment 66171

And there would still be space available for the bicycle path and pedestrian trail on the south side of Eglinton, west of Martin Grove.

I believe they want to be north of Eglinton once they get past the 427 intersection. They can stay north with very few intersections until the Renforth Gateway where the BRT is also north of Eglinton. With the stream/river just west of all the mess of intersections it may need to be a flyover starting east of Martin Grove and ending just before the first underpass. If they add time to any of the lights in this area it will make the mess even worse.
 
Maybe they are getting closer to the correct solution (7 + 3) and grade-separated. But can't they just study the proper solution at the beginning instead of spending years posturing and playing politics.

Totally agree on the 7+3 option for stops. But I don't think they require grade separation other than a few intersections. A bit of an overkill for some of the roads here. And with far-side stops the LRT can basically go as fast with or without grade separation.

They probably have to grade separate Weston (too steep of a hill). And elevate at Jane for the same reason. Martin Grove/427 will also need a solution to avoid the transition from a centre alignment to a northern alignment. Other than maybe Kipling I don't think the other intersections are big enough to warrant some grade separation.

This assumes the LRT has signal priority and we know how well Toronto does on that. They can't even get a southern alignment on QQ to run efficiently.
 
I don't like the idea of grade-separating 80% of the line.

Grade-separate Jane. Martin Grove needs to be grade-separated too. Then 427 need it as well. Islington is pretty busy, so it requires grade-separation. It may not be 100% necessary at Scarlet and Royal York, but it would help greatly. The tracks would be about 8m to 10m above grade so for each grade separation, it takes about 400m to climb up to elevation, then 100m for a station, then 400m to descend back to grade (assuming 3% grade and smooth vertical curves). This takes up almost the entire block. With grade-separation, the entire line can run on auto-pilot. It also improves reliability greatly by completely eliminated traffic-transit conflicts.

I believe they want to be north of Eglinton once they get past the 427 intersection. They can stay north with very few intersections until the Renforth Gateway where the BRT is also north of Eglinton. With the stream/river just west of all the mess of intersections it may need to be a flyover starting east of Martin Grove and ending just before the first underpass. If they add time to any of the lights in this area it will make the mess even worse.

I had the elevated line switching from the north side to the south side somewhere between Kipling and Martin Grove (station on the SE corner of Martin Grove and Eglinton). The line line would go under the hydro corridor then over the Mimico Creek and Eglinton and pass under the north spans of the 427 bridges.
 
They probably have to grade separate Weston (too steep of a hill). And elevate at Jane for the same reason. Martin Grove/427 will also need a solution to avoid the transition from a centre alignment to a northern alignment. Other than maybe Kipling I don't think the other intersections are big enough to warrant some grade separation.

Best bet would be to punch the line out from a portal in the hillside going towards Jane. I imagine if you're moving ahead with Crosstown West, you'd want to hasten the tunnel from Mount Dennis to east of Jane so it can be done at the same time as the Mount Dennis station. Maybe do it as a change order to the CrossLinx project or do it as standalone before the rest of the line.

As for the grade separations, I saw somewhere someone note that because the Islington/Eglinton intersection is in a bit of a dip, you could actually keep the LRT relatively level and go OVER the intersection.
 
Eglinton Road Closure February 19-21

Photography Drive Bridge Demolition

From this link:

What is happening?

The first step in the construction of the Mount Dennis Station requires the demolition of the Photography Drive Bridge deck, which was closed in 2002. The Photography Drive Bridge is located over Eglinton Avenue West between Black Creek Drive and Weston Road. Eglinton will be closed between these streets during the demolition.

map_5.jpg


How:
Beginning in February 2016, a crew will move equipment on-site and prepare the bridge deck for demolition.

Toronto Hydro will remove street lamps and reuse them elsewhere.

Asphalt, concrete and steel girders will be removed from the bridge and recycled.

Jersey barriers will be installed to redirect traffic and to protect workers.


When:
The bridge demolition will be from 9 pm on Friday, February 19, for 50 continuous hours to 11 pm on Sunday, February 21.

Demolition could be rescheduled due to weather conditions or unforeseen circumstances.


Where:

Our crew will be visible along Eglinton Avenue West in the vicinity of Black Creek Drive and Weston Road.


Traffic and Transit Details:
For the safety of workers, motorists, and residents, Eglinton Avenue West between Black Creek Drive and Weston Road will be closed during the bridge demolition.

Eastbound through traffic on Eglinton will be rerouted south on Weston Road and north on Black Creek to continue east on Eglinton continue west on Eglinton

Message boards and paid off-duty officers will be used to alert motorists during the closure.

Access to the No Frills will be maintained from Black Creek Drive. The Eglinton access to No Frills will be closed for the weekend.


Pedestrians:
The sidewalks on the north and south sides of Eglinton between Weston Road and Black Creek will be closed during the demolition.

As always, please take care when travelling near construction areas.

- See more at: http://www.thecrosstown.ca/news-med...-drive-bridge-demolition#sthash.SdR14nTa.dpuf

I think there's a typo in the heading. Should be Eglinton Avenue West, and not Eglinton Road. Wrist slap.
 
Does anyone know if there will be any bus routes extended / diverted to connect to the Crosstown?

Specifically, I'm thinking of the 168 Symington bus, which now terminates at Avon Loop (Weston Rd. and Rogers Rd.). Maybe they should consider extending the route approx 1.2km up to Mount Dennis station at Eglinton Ave. and Weston Rd., since that's a major hub and all....
 
Does anyone know if there will be any bus routes extended / diverted to connect to the Crosstown?

Specifically, I'm thinking of the 168 Symington bus, which now terminates at Avon Loop (Weston Rd. and Rogers Rd.). Maybe they should consider extending the route approx 1.2km up to Mount Dennis station at Eglinton Ave. and Weston Rd., since that's a major hub and all....

Go to Chapter Three of the Addendum to the EPR, at this link. For the complete reports, see link and link.

EPR Addendump 1.jpg


It'll change by the time the Crosstown LRT opens, of course.

168 Symington
would be extended from the Avon Loop to the proposed Mount Dennis Bus Terminal, both ways via Weston Road and Eglinton Avenue. Peak service would operate every 4 minutes.
 

Attachments

  • EPR Addendump 1.jpg
    EPR Addendump 1.jpg
    366.8 KB · Views: 964
Last edited:
Go to Chapter Three of the Addendum to the EPR, at this link. For the complete reports, see link and link.

It'll change by the time the Crosstown LRT opens, of course.

Is there any plan for a bus-only access/egress on the north side of Eglinton? It looks like all the bus access will be on the south side which will add longer times to every bus route

I'm thinking at Keelesdale Rd so it can go under the LRT and then head directly to the bus terminal.

With this left turn (stop light) being so close to Black Creek they will have to time it with traffic. That light is over a minute long and given the number of busses coming out of here that's serious additional time for each bus (and will add to bunching on Jane)
 
From the updated EPR.
Mt. Dennis transit hub.jpg

They are proposing to extend the new Photography Drive to connect with Industry Street, which connects with Black Creek Drive.

Then look at this link.

former-kodak-lands-update-november-19-2015-23-638.jpg
 

Attachments

  • Mt. Dennis transit hub.jpg
    Mt. Dennis transit hub.jpg
    532.4 KB · Views: 1,051
So if the platform will be at street level, I assume it will be far enough from Weston Rd that the trains can dive under that street and then resurface again toward Jane?
 
From the updated EPR.
View attachment 66478
They are proposing to extend the new Photography Drive to connect with Industry Street, which connects with Black Creek Drive.

Jeez, I forgot how absolutely massive these facilities are. I'm wondering a couple things: a) is there a provision to affordably cover the storage tracks to keep the LRVs free from the elements while parked overnight; or b) has there been a design so that in the future Mlinx could actually deck over the tracks for future redevelopment overtop. With air rights leasing and the somewhat prime location, this could be a major boon to the Prov had it been considered.

*seems like the storage tracks cover almost 20acres. That's fairly sizable, particularly if zoned as high-density.
 
Last edited:
The tracks will go down an 2% incline from the Black Creek overpass (over Black Creek Drive) and into the hill at Weston Road. The station box may have a 1% incline. The current design will be have the station box partly exposed and partly in the hill.

Mount Dennis 3.jpg


This is the 2013 design, so it will be have to be updated.
 

Attachments

  • Mount Dennis 3.jpg
    Mount Dennis 3.jpg
    357.8 KB · Views: 1,142
Is there any plan for a bus-only access/egress on the north side of Eglinton? It looks like all the bus access will be on the south side which will add longer times to every bus route

I'm thinking at Keelesdale Rd so it can go under the LRT and then head directly to the bus terminal.

With this left turn (stop light) being so close to Black Creek they will have to time it with traffic. That light is over a minute long and given the number of busses coming out of here that's serious additional time for each bus (and will add to bunching on Jane)
That is why I don't like about the TTC. They have to have buses loop into the station adding 2-3 minutes of unnecessary wasted time. From the west, I could see a lot of people getting off at Weston Rd and walking into the station instead of getting into the bus terminal. With Presto coming and the requirement to tap to get into the subway/LRT system, the whole concept of fare paid zone will change. Everyone, not just metropass users can get off early and walk into the station using their transfer registered on their presto card. It's going to be annoying to take the Weston Rd bus through Eglinton if it needs to loop into the station and out. It's like Wilson and Downsview station but worst.

When the LRT extends to the airport, they'll should build a bus loop at Eglinton/Jane and have the buses terminate there instead.
 