howl
Active Member
I think the real question is why couldn't this be tendered as smaller projects to speed up the process and allow for a staged opening of segments as they are completed? Is cost really the only thing holding that back? If so, would you know how significant the cost difference would be?
Ie. The portion from Black Creek to Eglinton West could have been phase 1, Eglinton West to Yonge, or right to Leslie as phase 2, and the surface portion as phase 3.
And would the savings in staff (bus drivers), diesel, and equipment make up for the increase in cost to get phase 1 opened sooner? Surely the city and TTC would save quite a bit of money by no longer having to run buses along Eglinton West if that portion were to open sooner. Also factor in the cost of gridlock, lost ridership from construction delays, lost business, etc.
I believe the Keele to Oakwood section of the tunnel will be turned over to Crosslinx sooner than the Eglinton West to Brentcliffe section, however it doesn't make sense to operate the LRT to Oakwood and then have everyone transfer to buses to get to Eglinton West. Eglinton West will be one of the last stations to be built since it is the west end of the Allen to Yonge tunnel and will need to be under the controlled of the tunnel contractor until the TBM's reach Yonge.