AlvinofDiaspar
Moderator
Well the argument raised by Metrolinx is that the change will have to go to council for approval and they don't want the possibility of delay. Let's face it, taken from face value who would blame them?
AoD
AoD
Maybe they could build up around the Leslie Station and make the stop worthwhile and continue it underground.
I also lost a lot of faith in two people who I used to have a great deal of respect for in transit circles: Glen Murray for reopening the Scarborough RT replacement debate for the umpteenth time and Steve Munro for crusading against a tunneled alignment to Don Mills and using "access to the park" as a red herring to get people on his side.
Metrolinx claimed the tunneled section and relocated station would provide better access to the park. Metrolinx was using the park as justification for the tunnel.
Steve Munro was not much against this particular tunnel, and certainly did not bring "access to the park" as an argument against such tunnel. Some people posting on his site did.
5 minutes seems like quite a stretch for the addition of a single station.
Say what you want about Ford but out of all the letters I've sent to politicians on he and my local MPP ever bothered to respond to me. It feels so damn futile when they won't even send an acknowledgement of receipt leaving you to wonder if they even read it. I don't expect a full written response all the time, just some degree of confirmation that I'm being heard.
There was a UT member (forgive me for not remembering the name) who came up with an excellent transit funding scheme based on auto rates. He sent a well thought out letter to the NDP leader about his idea and they couldn't be bothered to send so much as a boilerplate thank you message in return. The least they could do is acknowledge the letter. All these politicians seem care about is their poll numbers.
1. The LRV now has to decelerate down the hill toward Leslie station (because it must stop there)
2. It has to wait for a complicated left-turn light cycle at Leslie and Eglinton
3. It has to stop at Leslie station to entrain and detrain passengers - the dwell time can be around 30 seconds.
4. It has to accelerate up the hill toward either Laird or Don Mills
5. It has to wait for a complicated light cycle at Don Mills and Eglinton (I originally thought that Don Mills station would be at-grade; who knows what it'll be, these plans change daily!).
Partly true.
1. It will stop on a downward slope when westbound, which is a disadvantage, but it will actually be on an upward slope when eastbound, which is efficient, as gravity helps brake.
2. We don't know what the signal priority system will be.
3. If no one actually lives at Leslie, why would the dwell time be half a minute?
4. As noted, it accelerates down the hill when westbound.
5. Why do you keep saying this? They have said they are going back to the original EA plan, in which there is a portal about 800 feet before Don Mills and an underground station. No one has talked about an at-grade station here in years.
The only thing affecting the speed of the route between Laird and Ferrand is the single controlled intersection at Leslie. Even without any signal priority this light would be green about half the time, and so the average wait time would be half of the length of the signal cycle. How long is that, about a minute? Your 5 minutes doesn't stand up.
This plan doesn't change every five minutes. In the fall they proposed a change, and after public consultation, the change was cancelled and they went back to the approved plan.
Unfortunately, it's true that the planners defended their proposed change as the best solution and had to back down on it. This reflects our political & public service culture. No one who works for government is ever allowed to suggest that what they are "explaining" is a compromise. Everything is optimal. Alternatives to the agreed plan are shown to be unworkable, but when they become the new plan they are shown to be improvements. No one acknowledges the contradiction; you could say so in a memo, but that would never make it to the final edit. I don't know how it got this way, but it's not the fault of the planners of the Eglinton line. If you want to see this in action, go back and read the last 5 years of planning documents on the Ottawa Confederation Line. Nearly every feature of the final plan, save the basic route, was suggested at some point and ruled out, until it became part of the plan for cost-cutting reasons, at which point it became an improvement.
is there a source for the fact that it will no longer run underground to don mills? I can't seem to find one.
Metrolinx has restored a Leslie St. stop to the Eglinton-Scarborough Crosstown LRT by dropping its proposal to tunnel the transit line further east to Don Mills Rd.
http://www.thestar.com/news/gta/2013/05/12/metrolinx_puts_leslie_back_on_the_crosstown_map.html
Thanks for screwing up the line even further...
Those councilors makes me sick...The lots of them
If getting a change on the line is that easy, maybe all Scarborough should show up demanding elevated transit on Eglinton.
protest. now.
Each event will include a short presentation by TTCriders followed by an open mic question and answer period. Andy Byford and Chris Upfold will be responding directly to your feedback and comments.