That's quite significant. They seem to want a line that is completely grade-separated to Don Mills, which a lot of people have said makes sense. Probably no Leslie station, to pay for the longer tunnel.
It is a major change moving the portal from east of Laird to east of Don Mills Road. It was always planned that they'd tunnel under Don Mills Road ... so that there would have to be 3 portals (east of Laird, west of Don Mills Road, east of Don Mills Road).

Perhaps they concluded the extra cost of tunnelling was less than the cost of 2 portals and a Don River crossing west of Leslie.

So is Leslie station still on the books? That would be an interesting station underground. Laird and Don Mills stations might be deeper that originally planned as well.
 
I thought part of what led to Ford's transit plan trouble with council was that it was too much of a problem to tunnel under the Don.
 
Good decision. Since so many people using the Eglinton LRT will want to get off at the Don Mills stop (there are many apartment and office buildings near there), this will result in higher capacity west of Don Mills.

Now if we can only get level crossing arms (similar to Calgary) east of Don Mills.
 
If they are actually going to tunnel it all the way to Don Mills then there must be some kind of difficulty with building the portal where it is currently planned to be.

Otherwise tunneling all the way is unnecessary as the same effect can be achieved by just running the line on the south side of Eglinton on the surface as has been suggested many times.

I can imagine large and long term disruptions with building a TBM launch shaft and tunneling staging area at Don Mills and Eglinton, especially if the staging area is required to support tunneling operations all the way to Yonge Street.
 
So they are now tunnelling to don mills? That's a good long extension. Should speed up the trip time as well as allowing full grade desperation to a possible DRL interchange.
 
Two public events in December, from this link at www.thecrosstown.ca:

I was just about to post a comparisson for a couple of options for ECLRLT.

1. The current (yesterdays) plan for ECLRT, SELRT, and FWLRT.
2. The B-D extension to Sheppard.
3. The Elevated Eglinton Rapid Transit Plan.

One thing I have concluded is that the current $8.2B must be spent on these corridors, and it is not possible to bump up the DRL and completely ignore these lines. I show the rapid transit lines heavier than the LRT lines, and I show all Rapid Transit stations.

ECLRT 3 options - 3.jpg
ECLRT 3 options - 1.jpg
ECLRT 3 options - 2.jpg


In reading the DRL report, it became apparant that the DRL, as proposed, will not go far enough to relieve the Yonge line. In all DRL proposals, the number of riders will still increase on Yonge and the number of transferring passengers at Yonge-Bloor will increase. The only reason things looked ok in the report was that the capacity was increasing - mostly from improvements to the Yonge-Bloor station - which was not costed but was pegged at $1B in OneCity. I think the DRL needs to go north to take passengers off the Yonge line, and it needs to assit those from Scarborough, so they will indeed transfer to the DRL.

Making ECLRT an elevated Rapid Transit line (continuous with SRT) would provide more opportunity for those from Scarborough to transfer to the DRL. Notably, at a new DM/Eg station and not just at Pape, which may be difficult and costly to upgrade to a major interchange. Also, extending the DRL north to Finch (Seneca College) would take riders off of Yonge. I would build ECLRT all the way from Malvern (not just Sheppard) to Mississauga (Commerce Bldv) as a Rapid Transit Line. This eliminates the need for Sheppard/SRT and Jane/Eg to be temporary terminal stations until the extensions are completed. The only downside I can see is during the closure of the SRT (for upgrading), and also the effect if will have on the views and character of the Golden Mile area:). I am not sure if sending the ECLRT to YYZ is best or extending the People Mover, so I will stop at Commerce Blvd. I also propose to extend B-D to the West to hwy. 427 (Honeydale). This would be very useful for BRT routes on Dundas and 427. I would put a bit of money into improved busses for Finch and Sheppard to compensate for not getting a higher order of transit.

The B-D extension to Sheppard seems to have been under-costed in One City. When I look at costs, it appears there is nothing left for Finch. The only advantage of this is during the actual closure of the SRT. Otherwise the above Rapid Transit plan is much superior. Both this plan (B-D extension to Sheppard) and the Elevated Eglinton Rapid Transit Plan above are marginally more expensive ($300M) then the current phase of the transit City-like plan.

It is interesting that Metrolinx has finally realized that stopping the rapid transit ECLRT near Brentcliffe was an error. It is more interesting to note that Ford was completely wrong to tunnel the ECLRT under the Don River due to cost, but that it exactly what is being proposed. Are they switching to Fords plan? Will the next step be to continue the tunnelling past the DVP to prevent a major bottleneck at the ramp terminals and traffic lights around DVP? I always thought that a South side alignment was preferred from Brentcliffe to DM, and then elevated to Kennedy.

This is actually quite big news that Metrolinx and TTC finally realizes that ECLRT must work together with the DRL.
 

Attachments

  • ECLRT 3 options - 3.jpg
    ECLRT 3 options - 3.jpg
    94.2 KB · Views: 635
  • ECLRT 3 options - 1.jpg
    ECLRT 3 options - 1.jpg
    93.3 KB · Views: 1,136
  • ECLRT 3 options - 2.jpg
    ECLRT 3 options - 2.jpg
    92.8 KB · Views: 602
sometimes I think the one large grade separated eglinton route would be the best option. But my hope is once LRT gets to other areas of the city it will gain traction and eventually start convincing people its a real alternative to subways. By making Eglinton Grade separated the entrie way and not doing a sheppard and finch LRT we play into the myth that only subways work. If we want serious transit everywhere in the city that is cost prohibitive and not a option. We will have to wait over 100 years to get that finch subway Ford promised. Wed have to wait at least until the DRL and the yonge line was expanded before even looking at sheppard. Then there are a number of other routes that could have lrt as well which aren't even on the list yet. As a result I think the current plan works the best for future expansion of transit at a reasonable price.
 
All this time I thought DM has an underground station and it went to grade just east of it.

LRT would be a very wise decision in some areas especially Union/Miminco but Eglinton should be completely grade separated. It should be elevated to Kennedy to allow for automation and it would double the capacity as they would be able to run every 90 seconds as opposed to at the most every 3 minutes at grade and even that's pushing it. 50 meter grade separation has the capacity of 100 meter stations where any are at grade.

Interesting how some think Toronto will never accept elevated rail but the AirLink spur is completely elevated, Yes it goes beside a freeway and near commercial area but the Golden Mile is just commercial and light industry as well.
 
It is a major change moving the portal from east of Laird to east of Don Mills Road. It was always planned that they'd tunnel under Don Mills Road ... so that there would have to be 3 portals (east of Laird, west of Don Mills Road, east of Don Mills Road).

Perhaps they concluded the extra cost of tunnelling was less than the cost of 2 portals and a Don River crossing west of Leslie.

So is Leslie station still on the books? That would be an interesting station underground. Laird and Don Mills stations might be deeper that originally planned as well.

That's a good question. One thing that this opens up the possibility for is a redesign of Don Mills Station (if it's deeper, it will have to be redesigned). Given Metrolinx's recent announcement regarding the DRL, this may provide a good excuse to design a fully integrated intermodal facility, so the DRL can just be 'plugged in' when built, as opposed to having to be shoehorned in into a less than optimal connection.

Maybe have the Eglinton platform as a deep platform, with a future perpendicular DRL platform directly above it? Theoretically the DRL can be cut-and-cover until it has to cross the river (for which it can be a bridge followed by a tunnel under Thorncliffe Park). So having the Eglinton platform be the deep platform and the DRL be the shallow platform may be an advantage for both. With this I'm assuming of course that a trench will be dug in the Science Centre parking lot on the west side of Don Mills. Certainly appears to be easier than going either directly under the road or on the east side of the road.
 
Better than spending years and years before hand. Work on that part of the line probably isn't going to start for a motet 2 years.
 
I thought part of what led to Ford's transit plan trouble with council was that it was too much of a problem to tunnel under the Don.

My understanding is that the main trouble would be tunneling under East Don. They are not doing that anyway.

They only want to tunnel under West Don, and that might be easier (although I am a bit surprised that they rejected the surface south-of-the-road option).

Anyway, full grade separation between Yonge and Don Mills makes a lot of sense, and will allow more frequent service on that busy section.
 
Another problem with fords plan if I remember correctly was crossing the DVP, as there is no bridge to support a tunnelled line. The current plan is to have it run on the existing bridge.
 
I don't think this is driven by cost. It's going to cost more. It's driven by capacity issues. We're just not used to genuine planning issues influencing planning.
 