Monarch Butterfly
Superstar
Electricity used would also be cheaper at 3 AM. Could be an calling centre agent for Europe, between calls.What's wrong with posting at 3am anyway?Us sunlight averse folks don't bite! (Well, unnecessarily that is).
Electricity used would also be cheaper at 3 AM. Could be an calling centre agent for Europe, between calls.What's wrong with posting at 3am anyway?Us sunlight averse folks don't bite! (Well, unnecessarily that is).
Oh great, now someone is goiing to accuse Urban Transit posters of being foreign spies.Electricity used would also be cheaper at 3 AM. Could be an calling centre agent for Europe, between calls.
Oh great, now someone is goiing to accuse Urban Transit posters of being foreign spies.
I don't want to encourage anyone to mildly profit or lose off this information... but for Line 6 Finch West which is rumoured to be starting RSD on September 20th:
CityNews reporter said: "If everything works as planned, the line could open possibly as early as November" (Line 6)
Since Eglinton RSD has not even started... I think November 1st looks to be nearly impossible for Line 5 Eglinton
It's a shorter line with less underground stationsSo Line 6 will open before Line 5 even though Line 6 started construction in 2019, 8 years later than Line 5 and 1 year before it was supposed to open lol
still very hard to rationalize the 7 or 8 years gap.... no matter how repetitive this discussion is I still feel this is amazingly unaccepatable. lolIt's a shorter line with less underground stations
All we have is rumour, scuttlebutt, and word from the water-coolerHeard through the grapevines Eglinton LRT will not open in 2025 and the new target is Q1 - 2026 (not sure how accurate - seems pretty reliable however - so take it with a grain of salt)
Don't forget cryptic symbolism in dreamsAll we have is rumour, scuttlebutt, and word from the water-cooler
I'm not suprised.Heard through the grapevines Eglinton LRT will not open in 2025 and the new target is Q1 - 2026 (not sure how accurate - seems pretty reliable however - so take it with a grain of salt)
I think opening only the surface section would overwhelm feeder bus capacity at Don Mills/Eglinton, where incidentally Metrolinx has decided to demolish the new bus terminal without opening it, so I don't think that's a good idea.Personally where I in charge of the thing I might soft open the surface section while continuing to work on the rest. The surface section is afterall a street car.