The 900 Airport Express in 2018 carried 4,400 daily passengers. How many will transfer to Line 5 when it is extended to the Pearson Transit Hub?
 
The 900 Airport Express in 2018 carried 4,400 daily passengers. How many will transfer to Line 5 when it is extended to the Pearson Transit Hub?
Depends on where riders are coming from or to if they still need to get to line 2,

Line 5 is only going to the Renforth Hub at this time since there is no real plans for the airport hub nor the wiliness to build it at this time.
 
If they are going to bother to extend it all the way to Renforth then why not go the extra mile and go to the airport in one phase.
 
If they are going to bother to extend it all the way to Renforth then why not go the extra mile and go to the airport in one phase.
Because Metrolinx wants GTAA to pony up cash and provide land for the tracks and the station. If it wasn't for COVID cutting into GTAA's profits, it probably would have happened in phase 1. Now it's got to wait until GTAA makes their transit plans before it's worth trying to make the connection.
 
Because Metrolinx wants GTAA to pony up cash and provide land for the tracks and the station. If it wasn't for COVID cutting into GTAA's profits, it probably would have happened in phase 1. Now it's got to wait until GTAA makes their transit plans before it's worth trying to make the connection.

GTAA leases the land from the federal government; they have to assist in that regard as the land cannot be expropriated by the province.
 
I think that would be the Miway 100 Airport Express that runs now (pre-covid)
It was DOA before it hit the road as well on the route that lead to be cancel due to COVID. It should never return until the plan transit hub is built, if then. The 107 would replace it.

TTC has 2 option once the line 5 is open to Renforth.
Option 1: split the route into 2 routes with the 900 stay as is and another route to Renforth only.

Option 2 is to have the 900 stopping at Renforth in both direction with longer travel time with an extra bus or 2 to keep the same departure time.
 
Does anyone know the progress of the Allen and Eglinton intersection and if they started building the 3rd entrance on the south side of Eglinton
 