Virtual Open House - November 7, 2023, from 6 to 8 p.m. to learn about the designs and timelines

Main Question - Why is this project delayed into the 2030s

Link to register:

 
Here is the preferred design option as per the city website for this project:

96fc-don-mills-crc-aerial-perspective-se.png
8f4f-don-mills-crc-park-entry-view.png
972e-don-mills-crc-roof-terrace.png
9744-don-mills-crc-main-floor-plan.png
8f5e-don-mills-crc-second-floor-plan.png
 
View attachment 660727

The Donway is only 1km away from this spot but feels like 5km because of the hostile suburban streets.

View attachment 660728

View attachment 660729
I disagree. Yes Don Mills Road is busy in this area but unlike many other suburban streets the sidewalks in this stretch are grade separated and safely protected. As a pedestrian I feel very comfortable here.

I can’t wait for this place to open. This has been in some form of planning since the redevelopment at the Shops at Don Mills began. Almost 2 decades!
 
I hope they have rethought the mixed change rooms which will exclude many women in that area from the facilities…
 

Back
Top