Northern Light
Superstar
Preliminary Report on this one heads to the January 5th meeting of EYCC:
Some things the City is looking at (from the above):
Some things the City is looking at (from the above):
Does this hint at that?Are there station provisions for underground pedestrian connections (i.e. knock-out panels for a future tunnel from this proposed development to the station)?
Does this hint at that?
View attachment 418795
Any updates? Seems like this project has been quite silent. I've noticed on the broader scale, the York-South Weston area has not seen much momentum but many many exciting proposals. Especially around Weston GO and the Mount Dennis LRT station. Many proposals go back years and having followed them since, many have just not generated any movement![]()
• Height Adjustments: The tallest building has been reduced from 49 storeys to 45 storeys, and podium heights have been lowered to align with the Mount Dennis Secondary Plan
• Enhanced Mix of Land Uses: The amount of non-residential space has been increased, and a pre-school use has been introduced to support the creation of a complete community.
• Parks & Public Realm Improvements: Two new public parks have been introduced, including one which incorporates an additional parkland over-dedication secured as an in-kind CBC contribution to create two significant on-site parks, fulfilling parkland dedication requirements and prioritizing on-site parkland as directed by the Secondary Plan.
• Site Design Enhancements: The privately owned publicly accessible space (POPS)in the southern portion of the site has been removed, and the food store has been relocated from the northern to the southern portion of the site to improve site organization.
• Transportation & Servicing Upgrades: Ground-floor parking has been eliminated, additional loading spaces have been incorporated, and the loading strategy has been revised to enhance site operations.
![]()
Application Details
www.toronto.ca
Resubmission here with stat changes summarized in table below:
View attachment 647717
It will take years to be built. Likely more than the 3 ½ years left in the recession caused by Donald Trump. After which the market could change for the better.As if this will get built in this market![]()