Northern Light
Superstar
Some not great news on the Kensington pedestrianization plans, updated August 6/24.
1) Construction is pushed off to Fall '25
2) The interlocking brick which I thought was a huge improvement has been removed from the design in favour of asphalt.
Some pedestrianization is still proposed, but this has really been watered down from what should have been Market Street 2.0
www.toronto.ca
1) Construction is pushed off to Fall '25
2) The interlocking brick which I thought was a huge improvement has been removed from the design in favour of asphalt.
Some pedestrianization is still proposed, but this has really been watered down from what should have been Market Street 2.0
Kensington Market Safe Streets
The City of Toronto is planning important state-of-good repair work in Kensington Market, including watermain replacement, road resurfacing, and road reconstruction. Construction is planned on six streets and two laneways in the neighbourhood. As part of this work, the City is also making...




