Okay...I gotta ask, after how they botched the announcement of Niagara service expansion...

Does "four existing weekend trips that had previously stopped at Mount Pleasant GO will now continue on to Kitchener GO" mean four westbound trips that stopped at Mt Pleasant are getting extended, with four more trips returning eastbound? Or is it 2 WB + 2 EB = 4?



Wasn't there a post in the construction thread of a capital plan that included a new mainline platform for Georgetown GO? I've griped about that piece's deferral for years. The re-alignment of the switch at Silver Junction and expansion of the easterly run-up single-handedly made a great improvement to run time, but continuing to force trains to/from Kitchener to grind through the side track continues to weigh down travel time.

Good questions.

No answers just yet.

The actual news release will drop shortly after the presser starts which is 10am, on paper, though, as I've noted in the past, this government rarely starts pressers on time.
 
Press Release is out:


Mostly what we knew, but the 30M service to Mt. Pleasant gets mention.

From the above:

1760624481261.png

1760624508769.png

1760624548807.png
 
Any mention of timeline? This government loves announcements

I haven't watched the actual press conference.............I can rarely stand such things, and really, I can just wait on @Allandale25 to do that for us........ :p

Here's the feed for the press conference if anyone wishes to put themselves through that:
 
Last edited:
Okay...I gotta ask, after how they botched the announcement of Niagara service expansion...

Does "four existing weekend trips that had previously stopped at Mount Pleasant GO will now continue on to Kitchener GO" mean four westbound trips that stopped at Mt Pleasant are getting extended, with four more trips returning eastbound? Or is it 2 WB + 2 EB = 4?
I would always assume 2+2 unless it specified round trips. Also four trips sounds more impressive than two round trips.
 
This is a pretty big deal: https://www.ctvnews.ca/kitchener/article/metrolinx-extending-weekend-go-trains-to-kitchener/

Starting on Nov. 23, four existing weekend trips that had previously stopped at Mount Pleasant GO will now continue on to Kitchener GO.

Meanwhile, a weekday trip that had been stopping at Guelph Central GO will carry on to Kitchener GO.

Metrolinx is also adding 18 new weekend trips between Bramalea GO and Union Station, two new weekday trips between Bramalea and Union Station, and two existing weekday trips will be extended from Malton GO to Bramalea GO.
The biggest Kitchener line increase since 2023 and possibly the biggest train service increase of the year, this is all around incredible to finally see. One could see this as maybe a coincide for Mount Dennis and the Crosstown as a whole hopefully opening by then?
 
I haven't watched the actual press conference.............I can rarely stand such things, and really, I can just wait on @Allandale25 to do that for us........ :p

Here's the feed for the press conference if anyone wishes to put themselves through that:
watching now, key points.
- system wide 109% recovery of precovid ridership apperently
- kw ridership hit 154% of precovid in september
- cn agreement is to purchase land for tracks
- 40km of twin tracks
- no timeline due to the fact that the construction contracts havent went out yet and probably wont for quite some time knowing MX.
- media followed up for timeline on the 2wad 7days a week and dodged again
- possible incremental increase in service even during construction.
 
As if by magic, work seems to be picking up on the Strachan - Parkdale - Bloor portion of the Kitchener line
- telecom work at Parkdale
- grading and sound walls where the Barrie line diverges, hinting at double track on that line
- new and relocated “green zone” jersey barriers to protect work where the fourth track will be built south of Bloor (the former barriers south of Bloor are gone, meaning that stretch is ready for track laying
- Work reaumed on the Randolph underpass
- lots of grading and new temporary access roads across the CPKC Mactier Sub at the St Clair station site
- Continued major earthmoving at Resources Road
- track components hinting at installing the switch between the new track and the CP interchange at Black Creek
- a lot of preliminary grading and civil work at the Woodbine station site

If ML wanted to do this right, they would divulge their scope statement and some preliminary high level order of activity projections. I doubt they will. But this is all very encouraging that things are in motion and not just a paper plan or paper thin political promise.

- Paul
-
 
Interesting, so it does seem to indicate an agreement to build a dedicated 2-track corridor adjacent to CN's in the area to separate services entirely similar to what exists on LSE through Durham.

@Allandale25 - so CN would be left with 2 tracks of their own, narrowing to 1 through downtown brampton in the pinch point, and Metrolinx would have 2 tracks from Toronto through to Georgetown?

I do wonder if they are still planning the flyover as well.
 