Maybe someone could help me out here, is this work related to one of the Kitchener line contracts? This is just at Rockwood (Fourth Line), but I'd imagine the storage track here wouldn't require a bore under the tracks..? Then again Metrolinx hasn't been transparent about what any of the contracts entail.

1000017587.jpg
 
Maybe someone could help me out here, is this work related to one of the Kitchener line contracts? This is just at Rockwood (Fourth Line), but I'd imagine the storage track here wouldn't require a bore under the tracks..? Then again Metrolinx hasn't been transparent about what any of the contracts entail.
There was a culvert there wasn't there? I'd assume they are replacing it, perhaps so that it's wide enough for future tracks.

I'd assume it's cheaper to put the new pipe under all the tracks, rather than transitioning to traditional culvert underneath.
 
April 30
More up on my site

You can see how the next section of the bridge over Eastern Ave will connect to the new bridge
54512218945_9fee4c8fde_o.jpg

54512218780_fd36384698_o.jpg

54510992947_695e8c51b6_o.jpg

54512122908_a6dc2baa94_o.jpg

54512218865_9a2959f887_o.jpg

54510992937_98cc4864c6_o.jpg
 
GO updated the construction-related weekend train service closures.

Stouffville has two upcoming weekends in June and July that I am hopeful be used to bring more track between Kennedy and Unionville into service (sans Highland Creek bridge which was last estimated to be a summer 2026 deliverable).

A November closure for both Stouffville and LSE has been listed, which is a candidate for a 3rd track installation if the bridges and retaining walls are ready.

There’s a list of dates added for Barrie, Kitchener and LSW lines but I don’t follow those projects as closely because I’m not a regular rider on that part of the network.

 
GO updated the construction-related weekend train service closures.

Stouffville has two upcoming weekends in June and July that I am hopeful be used to bring more track between Kennedy and Unionville into service (sans Highland Creek bridge which was last estimated to be a summer 2026 deliverable).

A November closure for both Stouffville and LSE has been listed, which is a candidate for a 3rd track installation if the bridges and retaining walls are ready.

There’s a list of dates added for Barrie, Kitchener and LSW lines but I don’t follow those projects as closely because I’m not a regular rider on that part of the network.

big question is when can they double track from kennedy to the lakeshore mainline? the second kennedy platform is still disconnected. what are they waiting for?
 
big question is when can they double track from kennedy to the lakeshore mainline? the second kennedy platform is still disconnected. what are they waiting for?
The cynic in me thinks Metrolinx won’t even begin preparatory work on Kennedy to the LSE corridor until all of the remaining bridgework needed for LSE to be quad tracked to the Scarborough junction is completed.

It’s still not public on how they intend to double track that section either. Will there be a rail-rail grade separation or will the comments from Vester a few years ago where Stouffville gets 2/4 and LSE gets 2/4 tracks be the delivered solution?
 
April 30
Shot Queen, Dundas, Logan bridges before they are removed as well the Pape Area

Big different between the old and new height wise.
Queen next to be remove
54512408548_787ef16b1a_o.jpg

54512333994_a3d0e1af0d_o.jpg

54512144901_35fb675a38_o.jpg


Dundas
54513414614_4d8756c318_o.jpg

54512365642_1b8dcb93b6_o.jpg

54513492023_fe5d7b08a4_o.jpg
 
April 30
More up on my sites for all the bridges

Logan
54513584495_4cdaa6e587_o.jpg

54512365672_61accfa117_o.jpg

54513414509_910f3a53b0_o.jpg



Pape Area
54513590730_8f7046b632_o.jpg

54513590665_f2c48e0a9e_o.jpg

54513237616_8a200652bb_o.jpg

54512371932_999aae5614_o.jpg
 
My other observations of the day from the UP (besides Crosstown)
- there were workers on the platform at the Mount Dennis GO station... still material and machinery on the platform, wonder what is left to be finished
- Sound walls have been completed at the future Woodbine GO station... a very substantial set of walls.There appears to be site prep going on, with earth having been moved and construction equipment on site. Could this project finally be starting? Being TOD, the contract may not appear in the Metrolinx listing as it is privately sourced.

- Paul
 
,,,,,
- Sound walls have been completed at the future Woodbine GO station... a very substantial set of walls

1747260218489.png


.There appears to be site prep going on, with earth having been moved and construction equipment on site. Could this project finally be starting? Being TOD, the contract may not appear in the Metrolinx listing as it is privately sourced.

- Paul

Only newer permit than above is for this:

1747260287830.png
 
Thought of a question given all the Lakeshore East updates on this thread. What construction companies are working on the Toronto East rail bridge upgrades?
 
Thought of a question given all the Lakeshore East updates on this thread. What construction companies are working on the Toronto East rail bridge upgrades?
I think (but am not sure), that is under at least 5 different contracts.

Some of the Ontario Line bridges are under that advanced contract between East Harbour and Pape for the alignment. But I think Gerrard is under the station construction contract. Meanwhile bridge widenings between between Cherry and Yonge are under a different contract. Woodbine was under an advance contract for the Lakeshore East OnCorridor - and I think that some other bridges further east are under OnCorridor itself.

But it's a bit of a stab in the dark.

As to how many construction companies? Lots.
 