No, we haven't gone yet.
We're going tomorrow.
If you going tomorrow, exited the north side of the station and walk up to the new Englewood bridge, then cross Hurontario to go south. You will see the new Mary Fix Creek channel that has been built as well the northern section from the bridge being built. You will cross the tracks for the LRT that are in place on the west side of the and they will swing to the centre about 300-400m to the north.
You will see where the LRT is to go under the tracks as well the new sidewalk on the west side of it. As you head south, you will see the underground station with windows on the side as well the steel work for the new entrance to the station.
It a 4 block walk to the Credit River and looking north you will see the heritage Rail bridge that support 2 track with the non heritage bridge to the north. That view of the heritage bridge will be lost if ML builds the non heritage bridge for the 4th track. There is a plan to have a pedestrian bridge in front of that bridge with a possibility of a road bridge as well, but no clue where it stands today.
You will see the new tower that was build call Westport.
Nice ice cream store for the kids on the Lakeshore.
There is a plan to develop the marina by the Feds and still on the back burner.
If you go another 3 blocks west, you will see the redevelopment of the ESSO site call Brightwater.
Main place for Port Credit from my point of view is between Hurontario and the river.
It is a 25 minute bus ride to Square One Mall on the 2 and you will get a good look of the LRT corridor not done as well where the under construction for the new Mississauga Hospital at the south-west corner at the Queensway.. If you go to the mall, your trip back to the GO station will be a free ride with the fare integration.