It wouldn't be the first time Metrolinx designed a GO station to be accessed directly from a pair of on-street bus stops.
Finch-Kennedy GO Station
![]()
Milliken GO Station
![]()
The reason that @Islington Express Bus 's design is necessary is that there isn't enough room under the centre and south spans to fit four tracks plus two platforms. We would need the north track to go through the north span, which means that the road that currently occupies it needs to be realigned elsewhere.
The EMU yard is still shown on the OnCorridor PIC#3 materials dated November 2020, which is long after they'd decided to electrify the entire Kitchener line (not just UPX):
View attachment 533601
When you say "decided to electrify the entire Kitchener Line", you mean just to Bramalea right?