archited
Senior Member
I can imagine what happened here. When the design revision took the project from 17 to 22 stories and the GC was tasked with determining the extra cost, the "EXTRA" price came back higher than anticipated and the owner felt like he was getting ripped off. When angry words were exchanged over and over again the owner and GC reached a point of no return -- a few "F-Us" led to a no-win situation and the GC was fired.