Of course it will, a lot smaller and much less excavation, earthmoving required given it's being built on top of the existing parkade.Looks like this will probably be complete before Warehouse Park.
Of course it will, a lot smaller and much less excavation, earthmoving required given it's being built on top of the existing parkade.Looks like this will probably be complete before Warehouse Park.
I missed the part of "Close to lease up." However, could have sworn it has 258 units rather than the "285" listed in the article...
You'd think that the editor of Western Investor would know that Qualico Properties is Winnipeg based corporately and Edmonton/Calgary based operationally, not "Vancouver based".
Quick let's get another urbanist Youtuber to celebrate this momentous occasion!I rode my bike over to the park gate near the Museum to see the progress and a worker told me I would have to wait until tomorrow (to ride through).
So the public plaza area should be open tomorrow!
I rode my bike over to the park gate near the Museum to see the progress and a worker told me I would have to wait until tomorrow (to ride through).
So the public plaza area should be open tomorrow!
Can't wait to check this out before summer is over!The Switch/Stationlands is a classy project.
View attachment 673518View attachment 673519View attachment 673520View attachment 673521
I like the choice of paving stones for walk and a bit of concrete to the side for bike lock up/light fixtures etc
View attachment 673522
I don’t have one but I certainly do remember them!