1645925824061.jpeg
 
Just drove by this one and there was a crew on site while 112 street was blocked off with a couple of big trucks unloading tons of equipment including an excavator. It’s safe to say this one is officially starting. I’ll make sure to take some photos next time!
 
Last edited:
What I like about this and MacLab's projects is how close they are paired together and how this stretch will be essentially built-out in about 2.5 yrs. It will feel much more urban, walkable and won't be a continuous construction site for 4-5 years like we have seen on various blocks Downtown or on Whyte.
I've been thinking for a while that it might be good for the city to be more focused with its growth areas. Instead of hyping up 5 different TODs at the same time, it might be good to focus efforts on one at a time.

By the time station pointe is all built out I feel like all the pretty paving stones are going to need replacing.
 

Back
Top