I hiked all the way up to Blatchford Station, which is closed, but I was close enough to see that it used the exact same design as the new NAIT Station i.e. 10/10. There are also tail tracks, which I imagine will be utilized for storing extra trains for more efficient deployment.
View attachment 534331View attachment 534332View attachment 534333View attachment 534334View attachment 534335
It really bugs me how far it is from any of the development in Blatchford, and isn’t at least being used as a node for feeder bus routes in the interim, but hopefully, that changes over time. The lack of connectivity between Blatchford and the extension should be resolved this summer too, and hopefully, access to 109th Street should open up soon. A lot of the land around the alignment is also slated to be taken up by the NAIT expansion, which may take a long time to materialize, but will hopefully really tie the area together.
View attachment 534336