yeggator
Senior Member
Honestly, both master plans weren’t great for connecting LRT to the airport terminal. The last one used a branch spur that would have resulted in poor frequencies to an otherwise major destination, with the possibility of needing an extra transfer. And of course, this new plan gave up on connectivity to the terminal altogether. I would have liked to see a plan that involves a diversion of the LRT to the terminal and then back to the mall.




