cmd uw
Active Member
It will be a very transformational project given its scale and size.I swear this is going to greatly change the look and feel to the area.
It will be a very transformational project given its scale and size.I swear this is going to greatly change the look and feel to the area.
The bags are grout for those tieback anchors they are drilling through the shoring walls right now. They have a little tent built on the south edge to pump it down to the machine.They have gotten much further down the last 10 days or so. And based on the pallets of bags of cement on the south of the site, maybe footings coming very soon.
Please repost pic and comment on LRT page where people think tunnelling isnt an issue in Edmonton. Jk jk jk, but.. I mean if ya want to…..Man those sub-grade soil conditions sure look like a dog's breakfast.
| 2023-12-12 |
| Commercial Final |
| To construct a FOOTING AND FOUNDATION/PARKADE (Levels: P1,P2,P3 ) for a future tower and mixed-use buildings--" HAT @ Queen Alexandra, Phase. |
| 10455 - 81 AVENUE NW |
| $16,904,059 |