TwoWheelPoli
Active Member
I guess it makes sense to remove the temporary bridge before installing the south side ramp given the crane had to fit through. Having said that, this means the bridge will be off limits once work on the south side ramp begins. Hope that doesn't take too long.View attachment 684736
I passed a mobile hydraulic crane driving in from the south portal. I think it might be for removing the temporary construction bridge frame
View attachment 684737
May need @TwinHuey to do the next aerial shot in either mid or late October to see how that's coming along before riding up that way again.