Has there been a site plan showing how the hotel interacts with the adjacent parking garage? It's a long ramp that leads right up the to new hotel.

View attachment 741340
Access to the adjacent building will now be through the parkade of this hotel. This vehicle ramp will be demolished and reconstructed.
 
Has there been a site plan showing how the hotel interacts with the adjacent parking garage? It's a long ramp that leads right up the to new hotel.

View attachment 741340
The plan for the XYC building and the eventual development of this lot was for the parking garages to be merged. The XYC just had such a constrained that wouldn’t allow a ramp. So yeah it’ll be integrated.
 

Back
Top