A finalized design was un-veiled today for the beachfront hotel - see below.
1.png
2.png
3.png
4.png
5.png
6.png
 
I think the idea is that exposed wood, like on docks, turns grey with weathering. But I imagine the final building will be pink EIFS after the value engineering.
 
I haven't really been able to grab pictures as I have been driving but they pretty well have the roundabout directly after the bridge complete as well as about a quarter of the capping on the beach front done it's very hidden but progress is actually going pretty well here
 
Dropped down by the main beach (1) today. Most public access has been blocked for construction at this point. Here are a few articles and pictures on the progress to date.

1.png
2.png
3.png
4.png
5.png
6.jpeg
7.jpeg
8.jpeg
8a.png
9.jpeg
10.jpeg
11.jpeg
12.jpeg
13.jpeg
today. Most public access to the beach in this area has been blocked off for construction at this point. Following are a few updates on the progress to date.
 
Wasaga Beach is transforming into massive redevelopment project of Area 1. It will be built between phases and it will be completed within three years.

This project will include with 500 residential units 150 hotel units and 31 commercial spaces.

Demolition is underway with construction will be started in spring 2025.

View attachment 638417View attachment 638418View attachment 638419View attachment 638420
View attachment 638421View attachment 638422
https://engagewasaga.ca/beachfront-redevelopment
https://www.wasagabeach.com/en/news...ment-on-wasaga-beach-s-iconic-beachfront.aspx
The following siite plan shows a total of four traffic circles
 