News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6K     0 

Does anybody know if the LINK has reopened? I'll be at Pearson on Friday if no-one knows.
 
lack of expandability is a huge letdown. This should have been considered at the time of tender :\
 
lack of expandability is a huge letdown. This should have been considered at the time of tender :\
It's expandable ... it was designed to extend to a second Terminal 1 station, if and when T1 is expanded.

But it's designed to be a simple and cheap 1.5 km or so people mover; not 5 km transit system. Why build what you don't need for 15 years? It's kind of like complaining that it's a shame that the escalator in Pape station can't be expanded to DRL platforms.
 

Back
Top