2 years is 13% of the time it took to build Eglinton, so relatively speaking lolWe still have 2 years at least. 2028 is opening year as currently scheduled isnt it?
2 years is 13% of the time it took to build Eglinton, so relatively speaking lolWe still have 2 years at least. 2028 is opening year as currently scheduled isnt it?
3.5 years likely.We still have 2 years at least. 2028 is opening year as currently scheduled isnt it?
Rats! Foiled by math and critical thinking!2 years is 13% of the time it took to build Eglinton, so relatively speaking lol
Q3 2025 report said 13 vehicles of 40 were done and under testing. I wouldn't worry too much.I think the big challenge could be the arrival of the trains. I’m not sure when they’ll be ready.
That seems right, you don’t really need art work at Wem, miz, or lewis farms. Hopefully it’s better than the reindeer
Trains are desired by MIP to be running this fall btw.Exactly. We have 3+ years till the trains running. So how about they time it for the current state.
Everyone please email Marigold and cc your councillor. It can change things.
Would love to see it, but I doubt any testing beyond a few short blocks is possible in 2026. The majority of the line doesn’t even have continuous track bed, let alone track in it, let alone overhead wire connected yet.Trains are desired by MIP to be running this fall btw.
In my opinion (not representative of MIP), it'll be fully possible for the western portions of the line.