Sh!tty picture time:
IMG_2038.jpeg
 
I wonder if there is any chance that this Avenue for the most part can be completely closed with exception of temporary pedestrian walkway to hopefully have construction move as quickly as possible.
 
Perhaps next spring could see 105-107 Street undergo construction from Apr-June 2026 and 102-105 Street from July-September. Perhaps construction of the crossings at 104 and 105 Street could be split.
 

Back
Top