I wonder if there is any chance that this Avenue for the most part can be completely closed with exception of temporary pedestrian walkway to hopefully have construction move as quickly as possible.
Perhaps next spring could see 105-107 Street undergo construction from Apr-June 2026 and 102-105 Street from July-September. Perhaps construction of the crossings at 104 and 105 Street could be split.
Part II featured a lot of tarps covering the median construction. I think next week’s weather will allow for some outdoor construction, perhaps to allow for catenary pilings and duct bank work.
I hope that construction of the 104 Street crossing can begin in late April and finish in early June. If the Oilers get out their slump and back into playoff form, perhaps 103 Street could be done later.