The_Cat
Senior Member
They've got the temporary Henday exit open, a lot of the pilings for caternary poles done, and sections of road like Meadowlark complete. Some stations (like 182 Street and Glenora) are in the early stages of construction.
It's fun to see some of the infill around the line that you can see from the drone footage.
There’s gotta be 30+ high quality TOD sites along this leg. Already a half dozen getting worked on, but man, so much land to fill in still.
So so many lots to fill in.....ugghhh....is this being torn down anytime soon to make way for something new?There’s gotta be 30+ high quality TOD sites along this leg. Already a half dozen getting worked on, but man, so much land to fill in still.
Any ways the city can incentivize building along the line? Like a TOD grant program or something?
Yes, that building suffered from massive flooding issues a while back (reportedly over one million litres of water flooded into the basementIs this boarded up awaiting tear down?
![]()