"...RES Precast on-site for the inspection and erection of the final panel for Tower A — bringing this phase of the structure fully into place..."

1774700650102.png

1774700676786.png


1774700697789.png
 
I like the irregular wall precast angles along the northwest corner (last 2 pics), but I'm less keen on that filler window wall along the north elevation (at the west edge of the podium; 3rd last pic)
from teh
IMG_1070.jpeg
IMG_1064.jpeg
IMG_1065.jpeg
IMG_1072.jpeg



IMG_1068.jpeg
IMG_1069.jpeg
 

Attachments

  • IMG_1066.jpeg
    IMG_1066.jpeg
    314.5 KB · Views: 17
  • IMG_1067.jpeg
    IMG_1067.jpeg
    302.1 KB · Views: 14
  • IMG_1071.jpeg
    IMG_1071.jpeg
    253 KB · Views: 16
  • IMG_1072.jpeg
    IMG_1072.jpeg
    191.2 KB · Views: 14

Back
Top