Occupancy date is now set for October 2025.

Not sure if that is do-able or not.

My guess is the spring/summer of 2026 if they have no more delays.

There are a couple of units available for anyone who is interested.
 
Last edited:
Another laundry day, another update (2 loads)
Since this is getting taller, I took these from two levels, offering a better angle of the project as a whole, the last two images are my standard angle
20250702_122412.jpg
20250702_122417.jpg
20250702_122419.jpg
20250702_122519.jpg
20250702_122522.jpg
 
Once these condos are done, both semi detached homes on either end will need to be totally renovated and sold as part of Savile on the Roe.

I believe the same people will be doing that part as well. So, it’s not going to be over for awhile.
 
Once these condos are done, both semi detached homes on either end will need to be totally renovated and sold as part of Savile on the Roe.

I believe the same people will be doing that part as well. So, it’s not going to be over for awhile.
Perhaps not but it will be a lot quieter.
 
Doesn't look like those basement units will get much of an outdoor terrace, at least on the east end ...
 