Yowza! That orange protective shielding on the wires is supposed to stop things like that from happening.

42
 
I can't believe I missed that incident by a mere hour.

February 21, 2017:

IMG_20170221_142042.jpg


March 2nd, 2017:

IMG_20170302_083212.jpg


There are a lot of workers on the site each day. I count 30+ just now.
 

Attachments

  • IMG_20170221_142042.jpg
    IMG_20170221_142042.jpg
    971.9 KB · Views: 608
  • IMG_20170302_083212.jpg
    IMG_20170302_083212.jpg
    930.5 KB · Views: 686
I'm trying to understand how those steel beams facing Church St. fit into the design from looking at the renderings.
 
Probably to rest forms on until the floor has cured: that second level is far higher than regular shoring poles* can reach.

42

*as opposed to shoring piles that go into the ground, and which we talk about way more often.
 

Back
Top