kotsy
Senior Member
Posting this in the correct thread now.
Very looking forward to seeing this graph completed as the tower climbs. My only quibble is the spelling "meter", which in Canada refers to an instrument which measures, whilst a unit of measurement is a "metre".Went with a @Contra style update today.
View attachment 572988
This is how much more it has before it tops out.
View attachment 572987
If they construct every floor once a week, then it will take roughly a year and a half to top out.
Don't look up I'd say! Having people standing underneth it really goes to show just how massive that transfer slab is. I think the only other building in the city that made use of one that had the height of an entire floor before was Sugar Wharf, but I feel like the floor heights are a bit taller here.