Just now. That transfer slab sure is huge. There are also some interesting slanted columns appearing on top of the transfer slab.

View attachment 524824
I just realized those slanted columns at the corner must be for the vertical white line feature of the building that runs up the sides - very interested to see how that element turns out!
 
This is how they separated the pour between 1st and 2nd phase. Some type of well supported mesh. Picture from Oct 25th.

_N8A2105.jpeg


Dec 6
_N8A2950.jpeg


Looks like the final touches on the north end of the transfer slab.
_N8A2952.jpeg


_N8A2954.jpeg


_N8A2953.jpeg
 
Now to see if pace begins to pick up with the entire transfer slab poured, though I think it may take at least three floors for them to get a system down, but that will start to define the shape of the tower by that point. Here's looking forward to watching this go up as the one has and soon forma

PS. Also, now that that slide is curing, they can take out the supports from lower floors and begin fitting them out
 