The parking garage hasn’t begun construction yet. Not even a surveyor on site.
It’s worth noting that the Province had been seeking an alternate site, possibly at The Better Living Centre or on the Exhibition Place parking lots but both were ruled out because they were contractually required for the World Cup.
With the Cup weeks away, surely they can hold off construction of the parking garage until at least July and take possession of those north of Lake Shore lots instead of plopping down a garage on prime waterfront property.
Also no sign of Therme who mandated the construction of that garage in time for their opening. I’m sure an entire spa complex will take longer to build than a garage, so no rush.