Photos taken today, Saturday (Apr. 11). Since I posted a week ago, two major milestones on the project. Some glass has now been installed on the top floor of the main structure, level 84, visible on the south side... and the first segment of the Rail Climbing Systems (RCSs) installing the skin has been removed, on the west RCS.
www.flickr.com
www.flickr.com
One Bloor West (The One) "time-lapse"
From October, 2020, as above-ground construction started in earnest at The One (1 Bloor W.) in Toronto. More or less a weekly photo usually taken on a Friday, with some gaps during early-on construction hiatuses. The initial photographs are from 2015, during demolition at the site, 2018, during...
One Bloor West (The One) construction
Photos of One Bloor West (The One) construction progress, including a "before" shot from 2011 and several from 2015 after the demolition of Stollery's. Notable for becoming Canada's first supertall building, i.e., over 300 metres (985 feet) tall. (The CN Tower does not fall under the definition...