Around 5pm ish today from Queen's Park then a bit later from Bloor & Yonge:
1000098507.jpg

1000098604.jpg
 
Well, seems to be back to normal now - seemed to be up earlier but to a max of 2m each photo, now up to regular size that I can post.... These are all from Friday (Nov. 14), so already a little dated.

As compared to the previous Friday, the crown is the same, and the east and north Rail Climbing Systems are up a level or two, with the visible installed glass still at level 74.




View attachment 696491View attachment 696496View attachment 696495View attachment 696494View attachment 696493View attachment 696500View attachment 696499View attachment 696498View attachment 696497View attachment 696492View attachment 696502View attachment 696501View attachment 696503View attachment 696489View attachment 696490
Worth the wait.
 
Photos taken today, Friday (Nov. 21). While the crown of the building looks unchanged since my photos from last Friday, the Rail Climbing Systems (RCSs) installing the skin have all moved up as we see more and more of the finished exterior of the tower. The highest visible installed glass is now at level 75, on the south side, and the east RCS is now at that level. The north RCS is up to 74, west to 73 and the mini-RCS on the south face is at level 71, at least if I see this right (I don't always...). So, 9 floors to go for installing the skin, and 2 of those floors are on the mechanical level.

Light changed dramatically as I photographed this in the afternoon, the tower looks great in many light iterations.



UTIMG_4045.jpg
UTIMG_3718.jpg
UTIMG_3817.jpg
UTIMG_3480.jpg
UTIMG_3527.jpg
UTIMG_3572.jpg
UTIMG_3593.jpg
UTIMG_3652.jpg
UTIMG_3638.jpg
UTIMG_3680.jpg
UTIMG_3923.jpg
UTIMG_3402.jpg
UTIMG_3410.jpg
UTIMG_3328.jpg
UTIMG_3226a.jpg
 

Back
Top