December 28, 2024:

Yonge and Walton:

IMG_4990.jpeg
IMG_4991.jpeg
IMG_4992.jpeg
 
Photos taken today, Friday (Jan. 3). Since I posted a week ago, only the slightest of visible progress on the tower: the blue scaffolds for one of the super columns up top have moved up a level, as work progresses on what will likely be the last mechanical levels at 77 and 78.. So fewer photos this week as many are identical to previous ones.



UTIMG_7389.jpg
UTIMG_7359.jpg
UTIMG_7199.jpg
UTIMG_7250.jpg
UTIMG_7160-2.jpg
UTIMG_6957.jpg
UTIMG_7135.jpg
UTIMG_7071.jpg
UTIMG_6884.jpg
 
So they will be working on those small perch slabs that are halfway into the mechanical level now can't wait to see that final grade beam start getting formed and poured
 
I took over a dozen photos of The One today, so I will split them into two categories:

1. Photos from the U of T St. George Campus
2. Photos from off-campus (including Queen's Park)

Here is the first category, starting with two photos from Wilson Hall at New College:
20250105_093927.jpeg

20250105_093942.jpeg


In the following photo from the 13th floor of Robarts Library, The One is on the right:
20250105_114711 copy.jpg
 