20241129_134111-01.jpeg
20241129_134152-01.jpeg
 
I have a theory that because of how slow this building is being constructed, pinnacle is gonna top out like a month or two after this one, it's being built super fast compared to this, I expect this to top out by like January or February 2025 and pinnacle surely won't be too far behind, its pushing 200m and a new crane lift is coming soon so 🤷‍♂️
 
pinnacle surely won't be too far behind, its pushing 200m
Closer to 175m, the halfway point. Prestige next door is 216m for quick reference.

pinnacle is gonna top out like a month or two after this one
Even at a productive pace of 1 floor (~3m height) added each week, it would not top out for another 13-14 months.
 
Pinnacle One has vastly more floors and a greater height to climb. While The One has a fraction of floors left even if it stalls at the mechanicals and even if they push to 91 stories. I think the winner of this race has already been decided, IMO.
 
Here are some shots taken today, Tuesday (Dec. 3), from the east. The first shot from Danforth and Woodbine shows 1 Bloor W emerging from behind 1 Bloor E, and the second shows the same from Danforth and Pape. The last two reflection shots are from Bloor and Church or so.
UTIMG_3728.jpg
UTIMG_3869.jpg
UTIMG_3929a.jpg
UTIMG_3945a.jpg
 
Closer to 175m, the halfway point. Prestige next door is 216m for quick reference.


Even at a productive pace of 1 floor (~3m height) added each week, it would not top out for another 13-14 months.
Oh damn I really should've looked it up before talking out of my ass 😭
Thanks for the clarification 👍
 
Pinnacle One has vastly more floors and a greater height to climb. While The One has a fraction of floors left even if it stalls at the mechanicals and even if they push to 91 stories. I think the winner of this race has already been decided, IMO.
Yeah no that makes sense, i really hope they don't stall it for once 😭
 

Back
Top