kris
Senior Member
The core should surpass 1 Bloor East in a couple weeks.
Ooooh, that's an amazing angle! Love the framing.
Perhaps this has been answered, but are there people already occupying the lower floors while construction continues above. I know that's standard practice, but didn't know if that was the case in The One.
When I look at this video again that looks to be the case in the lower floors, unless that's just all construction equipment rather than furniture in there.
No, must be construction equipment. I've passed by at night and the floors that are lit up look unfinished.Perhaps this has been answered, but are there people already occupying the lower floors while construction continues above. I know that's standard practice, but didn't know if that was the case in The One.
When I look at this video again that looks to be the case in the lower floors, unless that's just all construction equipment rather than furniture in there.
It's common for construction teams to relocate site offices inside an enclosed portion of the building while the structure tops out, especially on constrained sites like this.Perhaps this has been answered, but are there people already occupying the lower floors while construction continues above. I know that's standard practice, but didn't know if that was the case in The One.
When I look at this video again that looks to be the case in the lower floors, unless that's just all construction equipment rather than furniture in there.
I know lol, but I wouldn't be surprised if pinnacle hits the 200~250 meter point before The One tops outThere is no way Pinnacle will top out before The One